BUILT AROUND YOUR EQUIPMENT
When standard specifications
do not fit your equipment
We review transformer requirements for control panels and industrial machinery. For a replacement, multiple voltages or limited installation space, start with the requirements you already know.
Feasibility, lead time and documentation are confirmed for each specification.

Share requirements
Send voltages, rating, application and mounting needs.
Feasibility review
Open requirements and quotation terms are reviewed.
Confirm, then manufacture
Manufacturing follows the agreed specification.
SPECIFICATION CHECKLIST
Six things to prepare for your inquiry
Phase & winding
Single-phase or three-phase / auto or isolation
Rated capacity
VA or kVA / load details if not yet defined
Input & output voltages
Identify selectable taps and simultaneous outputs
Frequency & duty
Required frequency / operating duty
Mechanical requirements
Size limits, mounting holes, terminals, enclosure
Quantity & destination
Quantity, requested date, destination, documents
It is fine to mark unresolved items as ‘to be confirmed’.
Discuss your specification Read the full checklist →